Construction of a connector between the buildings of the Unitral Hotel As we stressed on numerous occasions, BUDAGROS industrial construction performs a wide range of construction works and specialist orders. Here is another example. Installation of a connector between the buildings of the Medical SPA Unitral Hotel in Mielno. Project performed together with [...]

HOLIDAY SPORT Bielice – manufacturing site expansion (2019-2020)
Anna Miłkowska2024-12-11T14:56:34+01:00Expansion of the hall for Holiday Sport Manufacturing site and warehouses expansion for the Holiday Sport company in Stare Bielice.

MOWI (MORPOL) 3B HALL CONSTRUCTION (2019)
Anna Miłkowska2024-12-11T14:56:42+01:003B Hall Construction Based on the tender, “BUDAGROS-BIS” Sp. z o.o. was chosen for the project general contractor, defined as “Fish processing plant MORPOL S.A. expansion and reconstruction (MOWI Poland S.A.) in Duninowo STAGE I” in 2015-2016, In the following years from 2016 to 2019, subsequent projects in the design and build formula to [...]

NORDGLASS – hall and social building expansion (2018-2019)
Anna Miłkowska2024-12-11T14:56:55+01:00NORDGLASS Sp. z o.o. plant expansion in Koszalin involving manufacturing and warehouse hall and social and office building.BUDAGROS, the general contractor, performed construction works from January to August 2019The project was carried out in the design and build formulaThe scope of the project included:Preparing building permit design and execution design for expansion(involving manufacturing and [...]

Mojsiuk Mercedes-Benz. Car showroom in Szczecin (2018)
Anna Miłkowska2024-12-11T14:57:03+01:00Construction of Mercedes-Benz car showroom for the Mojsiuk company in Szczecin.

ABEL Koszalin – warehouses and cold stores with an office building construction (2018)
Anna Miłkowska2024-12-11T14:57:17+01:00Acting as the general contractor, we performed the project in “design and build” formula named “Construction of a warehouse building with office and social facilities and necessary technical infrastructure in Koszalin at ul. Mieszka I-go”. The scope of project carried out in 2017-2018 included: - design of warehouse building with office and social [...]

CHURCH ŚWIDWIN – roof and tower structure (2016)
Anna Miłkowska2024-12-11T14:57:24+01:00Our company manufactured and assembled roof and tower steel structure in a newly built church in Świdwin. Next, we covered the roof with panels and installed aluminum cross on the top of the tower.

ARKA SIANÓW (2017-2018)
Anna Miłkowska2024-12-11T14:57:32+01:00Arka Sianów manufacturing company New manufacturing hall for Arka sp. z o.o sp. k. from installation fittings industry

THAI UNION POLAND (King Oscar plant) – high storage freezer (Gniewino, Pomorskie province, 2016-2017)
Anna Miłkowska2024-12-11T14:57:39+01:00High storage freezer construction In the period between September 2016 and January 2017, as the general contractor, we performed high storage freezer construction for THAI UNION POLAND Sp. z o.o. The contract included project performance, involving comprehensive storage freezer construction of 1,450 square meters and 15 m high with technical and social facilities and [...]

MOWI S.A. (Marine Harvest group plant) – fish processing plant building expansion and reconstruction (Duninowo, Pomorskie province, 2015-2016)
Anna Miłkowska2024-12-11T14:57:50+01:00Fish processing plant building expansion and reconstruction A very important achievement of our company is fish processing plant of MORPOL S.A. expansion, a global leader in salmon production market, included in Marine Harvest ASA capital group. We were the general contractor of the project involving production halls construction of total area of 12 [...]

PIOTREX – construction of a fish processing plant (Rusko near Darłowo, West Pomeranian Voivodeship), 2015
Anna Miłkowska2024-12-11T14:59:13+01:00Construction of a fish processing plant Another investment implemented for the food sector was the construction of a service and storage hall for the “PIOTREX” fish processing plant in Rusko near Darłowo. The building area of the entire facility is 2,161 m2. The scope of the investment, which lasted from June to [...]

INTERMETAL Bonin extension of the production plant and construction of an office building (2014)
Anna Miłkowska2024-12-11T14:59:24+01:00Extension of the production plant and construction of an office building in Bonin for the dynamically developing company - Intermetal.

ROL-PLANT Rzęcino construction of a barn for 400 cows (2014)
Anna Miłkowska2024-12-11T14:59:34+01:00As a general contractor, in 2014 we built a barn for 576 dairy cows with an area of 4,988 m2 for the ROL-PLANT company from Rzęcin. Under the contract, we completed all required construction and installation works, i.e. water supply, technological sewage, and electrical installations. We delivered and installed the steel structure, and [...]

SWARZEWO TECHNICAL TOWER (2014)
Anna Miłkowska2024-12-11T14:59:47+01:00Our task was to make technical access – constituting a tower with stairs of a galvanized steel structure enclosed with sandwich panels – to the fermentation chambers of the sewage treatment plant in Swarzewo. We performed this installation at the request of the general contractor of the facility, GINZLER in 2014. [...]

ROL-PLANT feed shelter (2014)
Anna Miłkowska2024-12-11T14:59:54+01:00As a general contractor, in 2014 we built a 265 m2 feed shed based on a steel structure for the ROL-PLANT company from Rzecin. As part of the contract, we completed the steel structure of the shelter with a trapezoidal sheet metal covering.

HORTULUS construction of an observation tower (2013)
Anna Miłkowska2024-12-11T15:00:07+01:00In 2014, at the request of PPHU HORTULUS, we manufactured and installed an openwork steel structure of an observation tower in the theme garden of ornamental plants. The tower was made as a DNA helix – it consists of two flights of stairs and reflects its spatial model. The total height of the [...]

Construction of the Mojsiuk Group Peugeot Bielice showroom and service center (2012)
Anna Miłkowska2024-12-11T15:00:16+01:00In 2012, Budagros carried out large investments for the Mojsiuk Group in Stare Bielice near Koszalin, i.e. Peugeot showroom and service center and the Body and Paint Repair Shop. The most modern and at the same time the largest center for body and paint repairs of trucks and passenger vehicles in Poland was [...]

KAPITAN NAVI – extension and reconstruction of the fish processing plant building (Trzebiatów, West Pomerania Voivodeship, 2014)
Anna Miłkowska2024-12-11T15:00:25+01:00Extension and reconstruction of the fish processing plant building The extension and reconstruction of the "Kapitan Navi" fish processing plant, a plant for the production of herring deli products in Trzebiatów, is an investment covering 2,800 m2 of space. Structures of steel structure with a lightweight casing made of sandwich panels, constructed [...]

FIRST FISH SALES CENTER IN CHŁOPY – general contracting of the fish sales center
Anna Miłkowska2024-12-11T15:00:45+01:00Fish First Sales Center Construction of the "First Fish Sales Center" facility in Chłopy near Koszalin with an area of 165 m2. This small facility for a group of manufacturers consists of: a sorting room, cold room, ice maker room, social room, two unloading docks, and a container washer room. The facility was [...]

KOGA-MARIS – high storage cold store (Hel, Pomeranian Voivodeship, 2013-2014)
Anna Miłkowska2024-12-11T15:00:52+01:00High storage cold store As a general contractor, our company in 2013/2014, as part of the expansion of the fish processing plant KOGA-MARIS LLC, made a high storage cold store (temp. -25C). The refrigerated steel structure building with a lightweight sandwich panel casing is a facility with an area of 820 m2 and [...]

PAULA FISH (formerly Paula Trans) – a complex of fish processing plant facilities (Włynkówko near Słupsk, 2012-2013)
Anna Miłkowska2024-12-11T15:01:05+01:00A complex of fish processing plant facilities As a general contractor, BUDAGROS-bis LLC developed a full-discipline civil engineering design of a complex of fish processing plant facilities with an area of 12,000 m2 in Włynkówek on behalf of PAULA TRANS. The scope of the investment, implemented in 2012-2013, included the construction of: production [...]

Dr Oetker – production, storage, and refrigeration facilities (Gdańsk and Łebcz near Władysławowo, 2009-2012)
Anna Miłkowska2024-12-11T15:01:21+01:00Production, storage, and refrigeration facilities For three years, Budagros participated in the construction of large production, storage, and refrigeration facilities for Dr Oetker. The first one is a production building in Łebcz with an area of 6,000 m2 with a steel structure and a sandwich panel casing made by Budagros. A year later, [...]

Fruit cold stores – Grünewald Group
Anna Miłkowska2024-12-11T15:01:29+01:00Cold stores for fruit processing Cold stores for fruit processing are projects of Budagros for the Gruenewald Group. The first of these facilities was built in Poland for Pomerania Frucht, a company belonging to the group. After completing this contract, Gruenewald Group decided to entrust Budagros with the construction of a similar facility [...]

POLFRYZ – fruit cold store (Niemierzyno near Świdwin)
Anna Miłkowska2024-12-11T15:01:45+01:00Fruit cold store In Niemierzyno, Budagros built a fruit cold store for Polfryz. The refrigeration facility has a height of 10.5 m and an area of 2,000 m2.

AGROBRUSNO – a complex of utility rooms (Brusno near Koszalin)
Anna Miłkowska2024-12-11T15:01:53+01:00Utility room complex In connection with extensive plans for the development of agricultural areas, Agrobrusno entrusted Budagros with the implementation of a complex of utility rooms. At that time, grain warehouses, sheds for agricultural machines and a workshop for agricultural equipment were built near Koszalin. [...]

ABEL – food processing plant (Brąszowice)
Anna Miłkowska2024-12-11T15:02:00+01:00Freezer with warehouse and production buildingfreezer and warehouse with a total area of 840 m2production building with an area of 3000 m2

RYBAK [FISHERMAN] processing plant
Anna Miłkowska2024-12-11T15:02:15+01:00Construction of fish processing plant and freezer Production facilities and a freezer with a total area of 1200 m2
POMMERNFISCH
Anna Miłkowska2024-12-11T15:02:22+01:00Construction of fish processing plant and freezerProduction facilities and a freezer with a total area of 1200 m2

“Forum” Shopping Mall (formerly ATRIUM)
Anna Miłkowska2024-12-11T15:02:28+01:00Steel structures in the shopping mall building Characteristic structure – "tower" – located on the roof of the facility and other steel structures.
PAULA-TRANS
Anna Miłkowska2024-12-11T15:02:40+01:00Construction of fish processing plant and freezerThe facilities built by Budagros for Paula-Trans are a fish processing plant with an area of 1600 m2 and a freezer, the area of which is 1000 m2 and the height of the chamber is 10 m.

Biurkom-Flampol production plant
Anna Miłkowska2024-12-11T15:02:48+01:00Improvement of the Biurkom-Flampol production plant "Biurkom-Flampol", a company dealing with the processing and wholesale of game meat has decided to extend its offer to the processing and sale of fruit and vegetables. As a result of these decisions, we received an order to improve the premises of the existing plant in Szczecinek [...]

BARTEK fish processing plant
Anna Miłkowska2024-12-11T15:02:59+01:00Comprehensive construction of the BARTEK fish processing plant Niemierzyno near Świdwin, West Pomeranian Voivodeship, Poland

EMKA Gallery skylight design (2002)
Anna Miłkowska2024-12-11T15:03:10+01:00As a subcontractor, our company made and assembled the construction of the central skylight in the Emka Gallery in Koszalin.